Skip to main content
Search

    Road Closures

    Timeline Roads Description
    Thursday, September 16 from 5 am to 6 am 200 block of W Innes St. St. John’s has obtained permission from NCDOT & City of Salisbury to close both lanes of the 200 block of W Innes St at their church. This will create a detour for westbound traffic. Traffic will turn left onto S Church St; then right onto W Fisher St; and then right on S Fulton St to reach Innes St and continue their commute. This work is to take place this Thursday, September 16th between 5 am and 6am.
    Mid-September through November 200 block W. Fisher St. East Fisher bridge repairs have started. The repair is still estimated to take about 9 weeks.
    Begins late September, about 3 weeks. Downtown Salisbury, Main St. and Innes St. NCDOT resurfacing of Main and Innes Streets through downtown will begin Monday, September 20th at 8 pm. Construction will take place Monday through Friday between 8 pm and 6 am nightly. More details read this news article.

Subscribe to our newsletter

También disponible en español

Subscribe
Copyright 2021 by City of Salisbury, NC Terms Of UsePrivacy Statement
Back To Top